Past Projects

ZIM
Permalink Gallery

Zim International Shipping Co.

Zim International Shipping Co.

5801 Lake Wright Dr.
Norfolk, Va. 23502
In 2001, Gee’s Group built a 40,000 square foot headquarters building for Zim International Shipping Co. From start to finish the project took only 5 months.
An April, 2001 Virginian-Pilot report referenced the importance of the project to the City of Norfolk. Here is a […]

Silver Oak
Permalink Gallery

Silver Oak

Silver Oak

5900 Lake Wright Drive
Norfolk, Virginia 23502

Medical Office Facility
88,000 sq/ft including 8,000 sq/ft of Radiation Vaults. These Vaults required a 48 hour continuous concrete pour.

Floor: Three Floors
Opened: Summer 2004
Parking: 4.5 spaces per 1000 square feet

Amenities:

Professionally landscaped
Located near I-64
0.1miles from Norfolk International Airport
Abundant Parking
Security system with […]

Naples

10,127 sq/ft of retail space in Naples, Florida including Naple’s famous “Pastrami Dan’s”

RFS Taste end photo
Permalink Gallery

Riverfront Shoppes

Riverfront Shoppes

5140 River Club Drive and 5911 Harbour View Boulevard
Suffolk, Virginia

Beautiful neighborhood shops offering a variety of options for Retail, Office and Medical users. Located at the Entrance to The Riverfront Golf Community with Household Incomes Over $105,000 within a 1 mile radius!

Over 30% of the Population within 5 […]

Southport Centre
Permalink Gallery

Southport Centre

Southport Centre

4525 South Blvd
Virginia Beach, Virginia 23452

65,000 square feet of Class A office space

Floor: Three Floors, +/- 20,000 square feet per floor
Opened: July 1, 1997
Parking: Five spaces per 1,000 square feet

Amenities:

Constructed in less than 6 months
Easy highway access
Located on a lake with outside eating area next to […]

Twin Oaks 1 and 2
Permalink Gallery

Twin Oaks I and II

Twin Oaks I and II

Twin Oaks I and II
5700/5800 Lake Wright Drive
Norfolk, Virginia 23502

91,000 square feet of Class A office space
Four Floors, +/- 20,000 square feet per floor
Twin Oaks I Opened April 1, 1999 took less than 7 months to Build
Twin Oaks II Opened in October, 2000 took less than 7 months to […]